A major stretch of the A12 in Essex remains closed after a huge crater appeared in the carriageway, with motorists warned the disruption could continue for some time.
The southbound carriageway is closed between junction 14 for Margaretting and junction 13 for Ingatestone after the road surface began breaking up on Tuesday, November 17.
Traffic is being diverted from junction 15 at Webb’s Farm, with drivers facing delays while investigations and repairs take place.
What happened to the A12?
The closure was introduced after a large crater formed in the southbound carriageway.
National Highways has confirmed the road suffered significant water damage, with the source believed to be a wastewater leak.
National Highways are yet to announce when the road will re-open (Image: National Highways)
Essex and Suffolk Water has confirmed the leak did not originate from one of its pipes.
Pictures released following the closure showed a large section of the carriageway crumbling around the crater.
There are concerns water may also have compromised the supporting ground beneath the road, meaning the damage could extend beyond what is visible from the surface.
Read more
When will the A12 reopen?
There is currently no confirmed date or time for the A12 to reopen.
National Highways has warned motorists to prepare for a "prolonged closure", with significant repair work anticipated.
A Ground Penetrating Radar survey will be carried out to establish how far the damage extends beneath the road and determine the scale of repairs required.
The road will only reopen once engineers are satisfied it is structurally safe.
What is the diversion?
Southbound motorists should leave the A12 at junction 15, Webb’s Farm, and follow the B1002 towards Margaretting and Ingatestone.
Drivers should continue for just over three miles before turning left following signs for Ingatestone Garden Centre.
They should then continue for just under a mile before re-joining the A12 southbound at junction 13.
Motorists are being advised to allow additional time for their journeys, with delays expected around the diversion route.
Further information on when the A12 could reopen is expected once engineers have completed investigations into the extent of the damage and established what repairs will be required.
Share